Projects
KWD regularly invests in capital projects in order to provide high quality drinking water. Some of these projects have more impact on the community than others (such as main replacement projects that interrupt traffic) and others are projects that we think are of particular interest to the public. See the list below for more information about some of the projects that KWD is working on or has worked on in the past.
Project List
- PFAS Mitigation Basis of Design Memorandum (Posted 6/24/2022)
Appendix B: Record Drawings available upon request - Kennebec Water District Watershed Stewardship Plan RFP (Posted 5/19/2022)
- WTP Chemical Room Project Bid Advertisement (Posted 1/31/2022)
- Request for Qualifications New Operations Center Building Security (Posted 10/4/2021)
- Request for Qualifications SCADA Cybersecurity Assessment (Posted 7/9/2021)
- 2021 KWD Administration and Operations Center (Posted: 1/29/2021)
- 2020 Request for Qualifications – Administration and Operations Facility Design (Revision Posted: 10/21/2020)
Attachment A – Operations Center Concept Design and Cost Estimate (Revision Posted: 10/21/2020) - 2020 WTP Chemical Room Project RFQ (Revision Posted: 9/10/2020)
Pre-Submission Meeting PowerPoint (Posted 10/1/2020) - 2020 Risk and Resilience Assessment RFP (Revision Posted: 5/26/2020)
RFP Question Responses (Posted 6/25/2020) - 2020 Main Replacement Package: North Street, Middle Street, and China Road
- 2020 Waterville Downtown Project