System Facts
Communities Served: Waterville, Winslow, Fairfield, Vassalboro, Benton (water also wholesaled to Maine Water Company in Oakland)
Population Served: 22,500
Ownership: Quasi-municipal
Personnel: 28
Cost to customer per 100 cubic feet (748 gallons): $2.00 (as of 2023)
Price per gallon: $0.0027 (as of 2023)
Funding Sources for Operations: User fees though rates
Fiscal year: January 1 to December 31
Total water revenues: $5,620,207 (2018)
Number of pumping stations: 4
Number of water storage facilities: 6
Number of hydrants: 634
Number of active services: ~8,700
Miles of main: ~172
Sizes of main: 2″ – 36″
Storage facility capacity: 14.9 million gallons total
2nd Rangeway Tank: 0.90 million gallons – Steel
Ridge Road Reservoir Tanks (2): 6.0 million gallons each – Concrete
Treatment Plant Clearwells (2): 1 million gallons each – Concrete
Watershed Lands: 32 square miles
Raw Water Source: China Lake
China Lake capacity: 31.7 billion gallons
China Lake surface area: 6.1 square miles
Maximum/mean depth: 85 feet/ 28 feet
Annual flushing rate: ~30%
Average yearly precipitation: 43 inches
Average yearly KWD demand: ~1 billion gallons
Average daily KWD demand: ~3 million gallons per day
Treatment plant operations began: August 1993
Control system used: SCADA
Chemicals used: Aluminum Sulfate; Cationic polymer; Sodium hypochlorite; Hydrofluosilicic acid; Polyphosphate; Sodium hydroxide
Clarification process: Upflow – solids – contact
Filtration process: Conventional high rate
Filter media: Granular activated carbon, Sand
Disinfectant: Sodium Hypochlorite
Disinfection application: Post filtration
Sludge collection method: Recycle lagoon
Sludge dewatering method: Air dry and freeze/thaw
Sludge disposal method: Landfill